Cone Zone
- A portion of the southeast side of the Business School Field (West side of Regent Drive on Main Campus) will be unavailable from March 17-21, 2025 to accommodate a pothole truck. Contractors will pothole in order to locate utilities for new
- As work continues on Hellems, Engine Alley will close for a limited time to accommodate the installation of additional fencing. Engine Alley will be closed between the North Quad and Hellems.
- Construction of the Colorado Highway 119 Safety, Mobility and Bikeway Improvements Project has started and will be ongoing through 2027. Once complete, the corridor will have improved bike and bus facilities, and safer and more efficient
- The city of Boulder has implemented changes to the lanes on Colorado Avenue that may affect your daily commute. These improvements are part of a broader effort to create a safer and more efficient transportation system for our entire community, and
- Campus construction on Regent Drive near the Coors Events Center may cause delays to Buff Buses and other traffic from 7 a.m. to 5 p.m. Regent Drive will be reduced to one lane during these hours, and flaggers will be directing traffic. Please plan
- Construction has begun for the on campus Limelight Hotel Boulder. The Limelight Conference Center and Hotel at the 1400 block of Broadway will fill the gap in large conference space in the City of Boulder. With approximately 250 rooms and a 15,
- Work will begin at the southern end of the corridor between Colorado Avenue and Boulder Creek Path this spring and continue through summer 2024. Travelers can expect single vehicle lane closures and the east side sidewalk of 30th Street to be closed
- Residence One will be the first new, modern housing building to open in the area, North Boulder Creek (NBC). It will house 332 upper division students in on-campus apartment-style housing. It will provide neighborhood amenities such as a café, UPS
- In 2021 a structural assessment of the building was completed by a structural engineer. A/E team is currently developing a design to address the recommendations of the report. The scope of work being evaluated consists of: a full structural
- On May 31, 2024, at 5 p.m. the Leonard H. Gemmill Engineering, Math & Physics Library, located in the Mathematics Building, will close for renovations. Our timeline for reopening right now is summer 2025. These renovations are needed to restore